In south central Washington, ~ 3 river miles upstream from Columbia River confluence, near WA/ OR border Riverbend was hired (by J.R. Merit, Inc. Dam Removal General Contractor who was hired …
In south central Washington, ~ 3 river miles upstream from Columbia River confluence, near WA/ OR border Riverbend was hired (by J.R. Merit, Inc. Dam Removal General Contractor who was hired …
Santa Ana Dam had been classified as a high hazard dam, under the USBR’s Safety of Dams (SOD) criteria. The dam breach analysis indicated that there would be significant property …
The San Juan River Improvement project included master planning, design, and construction oversight. Improvements included five whitewater waves (with fish passage), two boat ramps, three irrigation diversions, many in-stream fish …
Riverbend prepared a Feasibility Analysis Report for Low Head Dam Modifications to the Animas Pump Station Diversion on the Animas River at Penny Lane Dam in August of 2013. This …
Construction of several dams for an irrigation diversion had raised the water level by 8 ft, creating a sediment trap and a fish barrier. Riverbend Engineering conducted topographic and stream …
Riverbend Engineering completed bathymetric surveys of four lakes in the Pagosa Springs area for the local water utility authority. The surveys were completed using sonar depth measurements and simultaneous total …
Riverbend prepared an assessment report for the current condition of this dam. Riverbend’s work included: a limited topographic mapping effort to measure the size and shape of the embankment; inspection …
Riverbend Engineering completed a bathymetric survey of this high elevation lake. A Stage-Volume relationship was developed for the lake. Riverbend analyzed the hydrologic response of the watershed and calculated peak …
Trout Unlimited (TU) was the project sponsor for design and construction of a fish barrier on Alamitos Creek in the Rio Pueblo drainage east of Sipapu. TU had identified a …