Rio Chama near Chama, NM – Cumbres & Toltec

cumbres toltec logoThe scope of work addressed stabilization of an eroding riverbank, threatening the south abutment of an historic railroad bridge. Riverbend designed the bank stabilization with large boulders. Riverbend handled the 404 and 401 permitting for the Cumbres & Toltec Railroad, and Riverbend directed the installation of the bank stabilization measures. Riverbend has also worked with the Cumbres & Toltec Railroad on the design of new railroad track at the Chama Depot, including rail extensions across the state highway.
Rio-Chama-near-Chama-NM-Cumbres-Toltec-Railroad-Bridge-Scour-Study