Navajo River near Dulce, NM–Jicarilla Apache Game & Fish
Endangered Fish Habitat & Municipal Water Supply Diversion This project spanned over 4 years and included a river assessment of ~9 miles for possible fish habitat improvements for species of …
Endangered Fish Habitat & Municipal Water Supply Diversion This project spanned over 4 years and included a river assessment of ~9 miles for possible fish habitat improvements for species of …
The project worked around culturally sensitive areas and multiple tribal member allotments. Riverbend completed an assessment, survey, preliminary design, and detailed cost estimates for all 11 miles of irrigation ditches …
The San Juan River Improvement project included master planning, design, and construction oversight. Improvements included five whitewater waves (with fish passage), two boat ramps, three irrigation diversions, many in-stream fish …
Irrigation Ditch Headgate Improvements on the Rio de Taos Pueblo, in Taos Pueblo, NM This project involved replacing of six (6) rock-pile diversion dams (Acequia Madre, Phia-no, C-, South Ash Pile, …
The Rio Grande Headwaters Restoration Project and its outgrowth, the Colorado Rio Grande Restoration Foundation is interested in finding ways to improve the historical functions of the headwaters of …
Construction of several dams for an irrigation diversion had raised the water level by 8 ft, creating a sediment trap and a fish barrier. Riverbend Engineering conducted topographic and stream …
Historic degradation and widening of the river had created shallow flow conditions and limited aquatic habitat for salmonids. Riverbend’s geomorphic analysis documented relatively recent channel bed lowering and straightening of …
This project restored a section of the river, which was severely damaged by flooding in September, 2013. The project included full replacement of an existing irrigation diversion dam and headbox, …
Channel degradation and bank erosion from over-grazing and poor management of irrigation water had led to poor water quality conditions and a lack of riparian vegetation. Riverbend Engineering’s design provided …
In the early 1970s a water diversion was constructed as part of the Colorado River Compact. This diversion takes water from the Blanco and the Navajo Rivers, and transfers that …